
Chicopee Public Safety Complex – (Chicopee, MA)
Renovated multiple areas within the facility and installed a 3000-amp transfer switch, a new generator, and MI Cable to provide a two-hour fire rating to all panels throughout the police and fire station. Work areas included lighting, power, data and a new fire alarm system. We worked with the safety complex to complete a power swap-over with minimal power interruption.


